Type
Industry and Energy
Local
Portugal
State
Finished
Year
2007
Client
EFACEC, SA
- The Amareleja Solar Park electrical substation is a 60/20 kV substation that operates as a collector substation for the 46 MW Solar Park. The substation consists of a 60 kV switchyard and a technical building where the 20 kV boards and substation control are located.
- Coordination, management and development of all project phases from design to execution, in particular: Structures, architecture, plumbing, technical installations, fire safety, telecommunications, earthworks, road network and drainage.