Type
Transports
Local
Romania
State
Finished
Year
2014-2018
Client
JV Bogl-Astaldi-Euroconstruct-Tehnologica-Proiect Bucurest
The new boulevard is in the western side of Bucharest and connects the second city inner ring with the A1 motorway, through a residential area with a low degree of occupancy.
Our work included Basic Design, Detailed Design and Technical Assistance of an urban expressway section with 8 km of dual carriageway and collector roads, as well as 4 grade-separated interchange.
The project also included 2 bridges, 15 overpasses and one cable stayed bridge over Dambovita river. The bridge has a total length of 235.20m, 2 spans with 69.5m and 164.7m and one carriageway of three lanes.
The scope of the works:
- Highway and side roads alignment;
- Earthworks;
- Geology and geotechnics;
- Pavements;
- Drainage;
- Retaining structures;
- Bridges and viaducts;
- Signing, marking and road safety measures;
- Landscaping and environmental mitigation measures;
- Right of ways and accommodation works.