Type
Industry ad Energy
Local
Portugal
State
Finished
Year
2011
Client
SIEMENS, SA
- The project consisted in the installation of a solar panel test field where the conduction of absorbed energy is carried out through a new molten salt technology. The loop takes up a floor area of 10,000 m2 and solar panels are supported by a metal structure based on ground screws. This project was carried out in partnership with SIEMENS and the University of Évora.
- Coordination, management and development of all project phases from design to execution, in particular: Structures, paving and drainage of the photovoltaic power station.